The last semester of my education is an individual Bachelor project. I had received a project from school which was a kindergarten placed in Kragelund. The project was a new construction of 692 m2. I have received the basis construction for components which after the analysis I had to change in order to make a building buildable. All the main information I have received from outline with plans, elevations and sections.
During the whole 6 months I had to move with my project into all 3 stages Scheme Design, Detail Design 1 and Detail Design 2. As my main focus in DD2 phase I decided to work on the roof- it was an interesting and challenging component. In my case I had 2 types of roof with the same construction but with different slopes. Additional my building consists of a skylight located in the whole corridor in a wat to ensure daylight in the classrooms which were located on the north site and required more sunlight.
I ended up with 607 m2 of one-story kindergarten with steel roofs and concrete internal walls and concrete external walls with steel frame inside and Cembrit cladding.